Like what you see? Have a play with our trial version.

Error rendering macro 'rw-search'

null

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Overview

Type

Icon

When to Use

Meter

You want to measure the rate of change of a measure against pre-defined targets. Useful for dashboard reporting.

Thermometer

Vertical representation of the meter chart, indicating a range of qualitative indicators.

Dial

Used to communicate key performance indicators.

Numeric Display

Shows the value of a metric on a digital display.

 

Chart Data Options

Option

Description

Measure

Typically a numeric value such as $. An item that you want to measure on your Chart

 

Meter Chart Tutorial

Summary

In order to set up a Meter Chart you will need:

  1. Create a report with chart display
    1. Select a field to use as the Measure
  2. Create your chart, selecting Meter as the type
  3. Provide the Measure option
  4. Customise the Chart as required
  5. Proceed to the Output step
  6. Apply Conditional Formatting if the chart requires it
  7. Save your report

 

Tutorial

1.  Start the Report creation process by using one of these methods:

 

    • Left Side Nav - open the left side navigation panel, click on Create, select the Report option

 

    • Top Right Button - click on the create button, select the Report option.

 

    • Toolbar - click on the Create link in the toolbar, select the Report option.


You will now see the New Report lightbox.

Left Side Nav

Top Right

(with Left Side Navigation enabled)

Toolbar

2. Click on the Ski Team view in order to use the fields defined within it for creating the report.

3. You will now be taken to the Data step of the Report Builder.

4. Add Camp Rating to Columns.

5. Apply basic Conditional Formatting to Avg Camp Rating following these rules:

  • Red < 5
  • Orange Between 5 and 7
  • Yellow Between 7 and 8
  • Green Between 8 and 10

The conditional formatting will be used to highlight the meter in order to indicate how the metric is tracking against a goal.

6. Proceed to the Charts step of the builder.

7. Select the Dial chart from the Meter section of the charts panel on the right of the screen.

The Chart Data options for Meter charts are the same, so this exercise can be used for any of those types, just by changing the selection made in this step to Meter or Thermometer.

8. Set the Measure to * Avg Camp Rating*

9. Save your report

 

 

 

  • No labels